Featured work

(a)Jacobsen elektro

 It’s a Norwegian company which was given a contract by Uganda government refurbishmentand extension of power stations at Owen falls dam, Lugogo ,mutundwe, mulago ,Tororo, Lira,Nkonge, Nkenda and Opuyoin Soroti .these were 11kv 33kv,132kv substations from 1999-2005.

(B)ABB UGANDA:-

On Umeme scada system upgrade for Entebbe, Nnamungona, Kisubi, masaka and Lugazi these were 33/11kv substations from June 2005-Feb 2006.

(C) IET International Energy Technik ( U) Ltd             

This is SIEMENS representative company in Uganda, on the new gas insulated system power station 132kv/33kv at Namanve from April 2007-March 2008.

(D)Britania Allied Industries Ltd

Installation of the new blending machines and upgrade of power house.

(E)MARMA TECHNICAL SERVICES.

10 MW Turbo-alternator control systems at Lugazi Sugar Corporation of Uganda ltd. 

(F) HOTEL EQUATORIA May-July 2009.

  • Upgrade of power room and many others.
  • Erection and termination of 2x1000kva transformers.Installation of thunder arrester spikes.

(G)UETCL 132/33KV 40MVA Transformer bay Tororo Main Substation (under ABB).

  • Erection of outdoor switch yard, indoor 33 switch gear, HV/LV cable laying and termination.
  • Wiring of Transformer, 33 KV switchgear, marshaling kiosk, control and relay panels.
  • Stringing of 132 Bus bar conductors.

  Period from July to December 2012.

(H)ESCOM EXCITATION SYSTEM PHASE 2 (under ABB).

✓ Erection and installation of exciter panels for generators 3, 5, 7 and 8.

  Period November 2012

(I)TORORO CEMENT NEW STEEL PLANT.

    • Construction of 33kv line extension, substation.
    • Erection and assembly of 33/415 2.5MVA Transformer, oil filtration
    • Erection and installation of power room.
    • Installation of the steel plant. ✓ Testing and commissioning.

Period from December 2012 – Feb 2013.

 

(J) ESCOM GASKET REPLACEMENT PROJECT UNIT 13 (under ABB).

✓ Changing all gaskets and o rings on unit transformer at Kiira Dam.

  Period June 2013

(K)Umeme METERING UNITS FOR TRANSFORMER 1, 2, 3 and 4 AT MUTUNDWE (under ABB). Period September 2013

(L)ESCOM GASKET REPLACEMENT PROJECT UNIT 12 (under ABB).

✓ Changing all gaskets and o rings on unit transformer 12 at Kiira Dam.

  Period September 2013

(M)ESCOM GASKET REPLACEMENT PROJECT UNIT 11 (under ABB).

✓ Changing all gaskets and o rings on unit transformer 11 at Kiira Dam.

  Period November 2013

(N)Umeme 33KV CAPACITOR BANK AT GULU SUBSTATION (under C&GANDIJES GROUP LTD).

    • Civil works15m x4m plus 7m perimeter wall.
    • Supply of H pole for 33kv overhead busbar.
    • Supply of Bank accessories (clamps, glands and termination kits).
    • Supply and installation of power/control cables and Earthing.
    • Erection, installation and commissioning of capacitor bank.

 Period Feb – March 2014

(O)UGANDA CROWN BEVERAGES LTD (PEPSI)

The Installation of power compensation equipment (power equalizer).

Period Feb 2016 

(P)ABB LIMITED

MAY 2016 INSTALLATION OF 33KV GIS SWITCHGEAR ABB TYPE ZX2 AT TORORO MAIN SUBSTATION UP TO JUNE.

  • This included the erection ✓ Assembling of the GIS.
  • Cable laying, glanding and termination according to the drawings.

(R)JUNE 2016 EARTH GRID CONNECTION WORKS FOR UMEME MONIKO LUGAZI SUBSTATION UP TO OCTOBER UNDER ABB.

    • This included laying of copper tape, conductor and earth rods
    • Equipment risers
    • Brazing/ cad weld

(S)SEPTEMBER 2016 PAC SPA. ACHWA HYDRO POWER PROJECT EARTHING GRID CONNECTION WORKS FOR POWER HOUSE IN (PADER DISTRICT) UP TO OCTOBER.

  • This included the installation of 6mtr earth rods.
  • Applying of bentonite clay.
  • Laying of earth mat and cad weld

(T)2017 APRIL -TECH LAB (U) LTD: SOIL RESISTIVITY WORKS FOR IGANGA, MUKONO, NAMANVE, LUZIRA AND LUGAZI 132KV SUBSTATIONS.

This includes point to point soil resistivity testing. 

  • MAY-NOV- SHANDONG TAIKAI POWER ENGINEERING CO.LTD:

Excavation, Backfilling, Compaction AND Earthrod Installation Works at Nkenda substation in Kasese.

2017-2020- KNIGHT FRANK (U) LTD

Transformer and Switch gear Service Contract for Bugolobi Village Mall.

  • DEC- BAMZEE ENGINEERING SERVICES:
    • Installation of 33Kv ABB GIS Switch gears 14 nos.at uetcl Lira Substation.
  • SEPT -ABB LTD:
    • Laying, Termination of 300sqmm Power Cable, Pressure Testing and supply of Termination Kits for Reactors at Kampala North Substation.
  • DEC- KNIGHT FRANK (U) LTD
    • Supply and Installation DC Power Supply and DP breaker to LV panel for the Switch gear.
  • MARCH -ABB LTD:
    • De-commission of Old system and Installation and Commissioning of new MDB Panel at Tamteco ltd.

2019 MAY-ABB LTD:

Installation of Entilli Fire Wall at Kampala North 132KV Substation. 

  • DEC-SUGAR CORPORATION OF UGANDA LIMITED:
    • Geo-electrical survey works (soil resistivity) for DG house, Switch yard and preparation of Report.
  • MARCH – INTERNATIONAL ENERGY TECHNIK:
    • Earth grid works for the Transformer plinth and Cable trenches at KisubI Umeme Substation.

2020 AUGUST- INTERNATIONAL ENERGY TECHNIK.

Laying and Bonding of Earth mat for the new proposed new Substation Transformer Plinth and Cable Trenches at URA Nakawa. 

2020 AUGUST – INTERNATIONAL ENERGY TECHNIK.

Supply of assorted materials for Nakawa, Bombo, and Mbale Substation.

2020 OCTOBER- INTERNATIONAL ENERGY TECHNIK.

Laying and bonding of Earth mat for the New Switching station and trenches at Mbale .

2020 AUG – DEC-ABB LTD:

Decommission, Installation and Materials for Unit 13,14 and 15 Generator Protection Upgrade at Eskom Kiira Power Station.